Emerald Bay State Park

Sherwood (operating as Fall Creek Engineering) designed wastewater system improvements for the Eagle Point Campground in Emerald Bay State Park on Lake Tahoe. The project included improvements for three main lift stations at the Park The project also involved the removal of the existing pumping equipment and controllers, and removal of the overflow tanks. The lift station improvements included a refurbished pump tank, an overflow tank to provide redundancy and safety, grinders, duplex pumps, backup high and low level float system, reactive air level sensors, and new controllers and a new SCADA control system.

LocationSouth Lake Tahoe, California
ClientCalifornia Department of Parks and Recreation